Free LEED AP BD+C ExamPosted On 09/03/2025|1 Comments Welcome to your Free LEED AP BD+C Exam Which actions should a project team take to complete a site assessment? A: Follow the EPA Construction General Permit (CGP) or local equivalent B: Conduct a site inventory C: Engage local experts D: Gather information on the property condition None English Female English Male A project team is designing a parking strategy that will include parking spaces under cover to mitigate the heat island effect. How should the top level of each multilevel parking structure be classified and/or calculated? A: Always as a roof area B: As a non-roof surface if there are parking spaces present or as a roof area if there are no parking spaces present C: As always excluded from the calculations D: As a non-roof surface if the space is publicly accessible to be counted toward SS Credit Open Space None English Female English Male Which tool would a project team use to calculate the 95th percentile rainfall event for SS Credit Rainwater Management? A: National Climatic Data Center database B: EPA WaterSense Water Budget Tool C: USGBC Rainfall Events Calculator D: LEED Online None English Female English Male 1 out of 3 Time's up
1 comment
arcsamazmeel
Thanks