Free LEED AP BD+C ExamPosted On 09/03/2025|1 Comments Welcome to your Free LEED AP BD+C Exam Which strategy would help a project team earn exemplary performance for SS Credit Heat Island Reduction on a project with a zero-lot line and a low-sloped roof? A: Cover 100% of the building roof with a three-year aged SRI material of at least 64 B: Shade the entire roof with a renewable energy system C: Have 100% underground parking and install a vegetated roof on top of the building D: Cover 100% of the building roof with a material that has an initial SRI of 39 None English Female English Male A project team has calculated the runoff volume of a project that will need to be managed. The site includes impervious hardscapes and a parking lot, as well as preserved open space. How much runoff does the project need to manage for the 95th percentile storm event for SS Credit Rainwater Management? A: 95% of the total site runoff B: Only the runoff from the impervious areas of the site C: Only the runoff from the developed portion of the site D: 100% of the total site runoff None English Female English Male A project team has determined a project\'s lighting zone and is now working with a lighting designer on the lighting boundary for the project. Which statement is true about creating the lighting boundary site plan? A: The lighting boundary must follow the LEED project boundary B: The lighting boundary must follow the LEED project boundary C: The lighting boundary can differ from the project boundary if the change is justified D: The lighting boundary must follow the property line None English Female English Male 1 out of 3 Time's up
1 comment
arcsamazmeel
Thanks