Free LEED AP BD+C ExamPosted On 09/03/2025|1 Comments Welcome to your Free LEED AP BD+C Exam A project team has engaged local experts prior to conceptual design to help inventory site elements. Which action will be aided by filling out the USGBC worksheet to document existing site conditions? A: Tracking any fertilization discharge restrictions B: Establishing stabilization measures for pollution prevention C: Monitoring control measures during construction D: Informing building location and orientation None English Female English Male A project team is designing a parking strategy that will include parking spaces under cover to mitigate the heat island effect. How should the top level of each multilevel parking structure be classified and/or calculated? A: Always as a roof area B: As a non-roof surface if there are parking spaces present or as a roof area if there are no parking spaces present C: As always excluded from the calculations D: As a non-roof surface if the space is publicly accessible to be counted toward SS Credit Open Space None English Female English Male A LEED BD+C: Hospital project located in MLO lighting zone LZ1 has selected lighting for the parking lot and walkways that have appropriate BUG ratings. The hospital has a helipad which requires additional lighting. The additional lighting for the helipad exceeds the minimum vertical illuminance of SS Credit Light Pollution Reduction. What should the project team do to earn the credit? A: Use the calculation method to see if the overall lighting levels will meet the requirements B: Check if the helipad can be excluded from the project boundary C: Exclude the helipad lighting from the credit calculations D: Change the lighting boundary to exclude the helipad None English Female English Male 1 out of 3 Time's up
1 comment
arcsamazmeel
Thanks